| | Okay, things are almost happening too fast right now. If all goes
as planned, I will have only 12 hours or so between when the finish on
my living room is dry and when the guys will be here to install the
flooring in the dining room and kitchen. If there is any
delay in getting my living room ready for the finish, they will have to
wait until after the linoleum is installed to put the finish on the
floor, which means all the living room furniture will have to be moved
back into the living room from the dining room where it is now, and
then back into the dining room, then back into the living room.
And tomorrow four people from work are coming over after work to help
me move my boiler. One of them has a trailer and a bad ankle and
shoulder....the other three and I will be doing the actual boiler
moving. I think there is a fairly good chance of everything going
smoothly with the removal. My two biggest concerns are getting
all four of them to show up and the boiler being too heavy for us to
lift. It was quite hot today, but my house stayed fairly cool,
even without an air conditioner. The thermometer in my thermostat
never got above 76 and with my windows open tonight, it should cool
down quite a bit.
|
| | Posted 6/25/2006 10:19 PM - 1 view - 2 comments
- recommend
    - recs0
- give stars
- votes0
- share
- email
 - sent0
Give eProps or Post a Comment |